Pre-fabrication Value Engineering Life Cycle  
 


Pre-fabrication has advantages over traditional installation methods. Reducing on-site installation periods, making efficient use of lead-in periods, reducing waste and increasing productivity, quality and reliability are all positive benefits of the pre-fabrication process.

Pre-fabrication, workshop and storage facilities at Aqua House cover an area of approximately 2,000 sq ft, with approximately 11,000 sq ft of storage.

Pre-fabrication allows:

Just in time material deliveries co-ordinated through supply chain.
Use of 3D drawing technology.
Standard dimensioned fully M&E integrated modules.
Constant flow regulating valves enable a reduction in the overall commissioning time.
The use of jigs giving dimensional accuracy, when pre-fabricating multiple modules.
Shared pre-fabrication facilities with Electrical, Ductwork and BMS controls sub-contractor enabling fully co-ordinated and finished modules.
Modular wiring installations.

Projects where Aqua has successfully used
pre-fabrication include:

Heathrow Travel Inn - £6,000,000.00
Fabrication off site of 610 bedroom pods
Pre-fabrication 120no. M&E Service risers
Unicorn House, Bromley - £750,000.00
Pre-fabrication of the roof plant room pipework
3- 5 Norwich Street, London - £1,100,000.00
 
Prefabrication of Basement plant room services
62 - 64 Cornhill, London - £1,400,000.00
 
Prefabrication of roof and basement
plant room pipework
Secure Training Centre, Milton Keynes - £3,100,00.00
 
Prefabrication of rooftop plant pipework
Carver Barracks, Impish - £3,800,000.00
 
Complete pre-fabrication of temporary plant room
Fleet Road Estate, LB Camden - £1,600,000.00
 
Pre-fabrication of plant room and vertical pipework
Denton Estate, LB Camden - £1,500,000.00
 
Pre-fabrication of plant room and vertical risers pipework
Tesco Stores (Royston & Lowestoft) - £2,600,000.00
 
Complete pre-fabrication of plant room
British library, London - £550,000.00
 
Prefabrication of two 1.2MW, MTHW packaged
plant rooms